A pilot project in Kazakhstan — The Eginsu station (Almaty railway division)

The Eginsu station (6 points) is the first pilot project launched in Kazakhstan. It was to repair the damage done as a result of disastrous floods which had closed whole sections of Kazakhstan railways, including the Eginsu station. It was imperative that we restore the train traffic as soon as possible.

Using our experience in the 1520 gauge territory, we managed to successfully complete and re-commission this vital line in only three months, all whilst maintaining the highest safety levels. The station was re-commissioned in 2010.

Introduction of the EBILock 950 CBI system at the Riga-Passenger station

The Riga-Passenger station (145 points) was equipped with the EBILock 950 CBI system. The project became one of the first realized in the Baltic States. It was started in 2000 and successfully finished in 2001 forming a good basis for our further cooperation with Latvian railways.

Modernization of the Stasilos station

The Stasilos station (5 points) was commissioned in 2011 equipped with the EBILock 950 CBI system.

A pilot project: modernization of loop № 36 (857-km).

In 2013 our pilot project was launched in Mongolia. The first EBILock 950 CBI system integrated into semi-automatic line block of the adjacent open lines as well as the axle counter system EBITrack 1800 were installed in Gobi desert at loop № 36 (3 points). In 2014-2015 three more loops (№ 31, 39, 41), counting 15 points, were equipped with the EBILock 950 CBI systems.

RUSSIA

Our presence in Russia has been growing significantly for over twenty years. The demand for our EBILock 950 computer based interlocking (CBI) solution continues to be the main focus for design and innovation in Russia.

Today our EBILock 950 CBI systems are successfully operating at more than 300 stations located on 16 railways, in 30 regions through all the territory in the Russian Federation, controlling more than 9 000 points and 850 km of line block systems.

Our presence across Russia stretches from Kaliningrad to the Far East. The EBILock 950 CBI systems are used at high speed lines Moscow — St. Petersburg and Moscow — Nizhniy Novgorod, at Trans-Siberian main line — a strategic transport corridor.

Large railway junctions such as Verkhniy Baskunchak, Bekasovo, Sverdlovsk Sortirovochniy and Shartash are also operated by EBILock 950 CBI. All commissioned systems are fully adapted to meet the requirements, rules and local instructions of the Russian railways.

Under Russia’s north regional development program we have been contracted to deliver our EBILock 950 CBI solution to the first several stations of this project in Yakutia. High reliability and environmental resilience, ability of our equipment to operate without the need for regular servicing or repair became the main reason for the Yakutian railways decision to select our EBILock 950 CBI for this section.

Construction of the new railway line Tashguizar — Kumkurgan

It is the first project of the signaling solution introduction within a CIS country. A contract for the construction of the new line Tashguizar — Kumkurgan in Uzbekistan was signed in August 2007 as a result of our victory in the international tender. Under the project 17 stations (178 points), 41 level-crossings were equipped with the EBILock 950 CBI system. The project also included delivery of a specially developed semi-automatic line block system fully integrated into our EBILock 950 CBI solution along 223 km of railway line, installation of the axle counter system, automatic level crossing signaling system and CTC system. For the first time, there were installed LED signals.

Construction of the Uzen — Bolashak section

The project involved equipping a 143-km section consisting of 8 stations (134 points) and 2 level crossings, with the radio-based traffic control system on a newly constructed line (the RBTC system based on INTERFLO 550 technology). The line was equipped with the EBI Lock 950 CBI R4 system, the axle counter system EBI Track 1800, the integrated automatic level crossing system EBIGate 2000. The project implementation period 2010- 2011. This is the first introduction of the RBTC solution in the CIS market.

Modernization of the East — West railway corridor, Stage 2

22 stations (215 points) and about 200 km of automatic line block were equipped with the EBILock 950 system, the integrated automatic level crossing system EBIGate 2000.

The project implementation period — 2010- 2011.

In addition to the EBILock 950 system and automatic line blocks, we equipped two large traffic control centres at Yelgava and Daugavpils transport junctions. During this project we gained experience implementing the new generation of the EBILock 950 CBI R4 system. This new Central processor unit is capable of supervising the largest stations and whole sections of the railways.

Modernization of the Trans-Mongolian Railway (The Khoit — Dzamyn‑Uud line)

In 2015 a contract was signed for the modernization of the Trans-Mongolian Railway with a length of 1111 km with the introduction of radio-based line block and CTC. In this unique project, for the first time in the world, radio blocking with moving block sections was introduced over the existing relay interlocking systems. As a result, the capacity of the railway was significantly increased and its reliability and safety were improved.

Volume of works:

  • 1111 km, 67 stations (958 points), 34 level crossings;
  • 3 radio block centers, 5 areas of the Central Processor ( EBILock 950 CBI);
  • 5 dispatcher operational railway telecommunication areas
  • 3971 balises;
  • 118 detector elements of the axle counter system;
  • 40 onboard systems;
  • 240 RUVIO relay object controllers;
  • Educational Center.

Electrification of the Marokand — Karshi railway section (141 km) with high-speed passenger trains traffic management

The project included equipping 141 km, 8 stations (226 points) with the EBILock 950 CBI system based on the R4N central processor, as well as equipping open lines with an integrated four-digit automatic line-block, integrated automatic level crossing systems, ATP system of digital coding, integrated automatic switching for a low-power hump at the Karshi station, CTC system. The maximum train speed at this section reaches 160 km / h. Project implementation period: 2014-2016.

Construction of the new railway line Zhetygen — Altynkol

The project included equipping a 256-km section consisting of 5 stations (304 points), 10 loops and 36 level crossings, with the radio-based traffic control system (the RBTC system based on INTERFLO 550 technology). The line was equipped with the EBILock 950 R 4 CBI system, the axle counter system EBITrack 1800.
The onboard equipment was supplied and installed for 19 single-section locomotives TE33A (Evolution), 4 shunting locomotives CKD6E that run at this section.
The project was implemented in 2012.

Construction of the second track in the Skriveri — Kruspils section

9 stations (158 points) were equipped with the EBILock 950 CBI system and 50 km of automatic line block. Project implementation period — 2014.

Electrification of the Karshi — Termez railway section

The project involved equipping 6 stations (137 points) at the route of 80 km with the EBILock 950 CBI solution based on the R4N central processor, as well as equipping open lines with integrated semi-automatic line-block with automatic block posts, integrated automatic level crossing systems, ATP system of digital coding, integrated automatic switching for a low-power hump at the Termez station, CTC system. Project implementation period: 2016-2019.

Construction of the new railway line Arkalyk — Shubarkol

The project included equipping a 214-km section consisting of 2 stations (115 points), 5 loops (115 points) and 31 level crossings, with the radio-based traffic control system (the RBTC system based on INTERFLO 550 technology). The line was equipped with the EBILock 950 R 4 CBI system, the axle counter system based on ACE controller. The station was commissioned in 2015.

Introduction of the EBILock 950 CBI R4 system at the Shkirotava station

Project implementation: 2015. 

211 points.

Construction of the new railway line Zheskazgan — Beineu, the Zheskazgan — Saksaulskaya section

The project included equipping a 517-km section consisting of 9 stations, 18 loops (245 points) and 24 level crossings, with the radio-based traffic control system on a newly constructed line (the RBTC system based on INTERFLO 550 technology). The line was equipped with the EBILock 950 R 4 CBI system, the axle counter system based on ACE controller. The station was commissioned in 2015.

Electrification of the Karshi — Kitab railway section with high-speed passenger trains traffic management

Under the project 5 stations (60 points) were equipped with the EBILock 950 CBI system based on the R4N central processor. The project also involved equipping open lines with an integrated semi-automatic line block, integrated automatic level crossing systems, ATP system of digital coding, CTC system, data transmission system, engineering communication system, rolling stock failure detection system. The maximum train speed at this section reaches 160 km / h. Project implementation period: 2018-2020.

Construction of the new railway line Zheskazgan — Beineu, the Shalkar — Beineu section

The project included equipping a 471-km section consisting of 9 stations, 13 loops (161 points) and 21 level crossings, with the radio-based traffic control system on a newly constructed line (the RBTC system based on INTERFLO 550 technology). The line was equipped with the EBILock 950 R 4 CBI system, the axle counter system based on ACE controller. The station was commissioned in 2016.

Construction of the new railway line Borzhakty — Ersay

The project included equipping a 14-km section with the computer-based semi-automatic line block (PAB-E), equipping 2 stations (21 points) and 2 level crossings, with the EBILock 950 R 4 CBI system, the axle counter system based on ACE controller. The station was commissioned in 2015-2017.

Development of the Astana railway junction, including construction of a new railroad complex

The project implied equipping the station, including the Technical Park (51 points) and the 1-st level-crossing with the EBILock 950 R 4 CBI system with the use of the audio frequency track circuit. The Commissioning period is 2015-2017.