The movement of trains at the Solnechnaya station (93 signals) of the future MCD-4 will be controlled by digital Russian automation made by the Signaling Division of the GC 1520
A modern computer-based interlocking system CBI-EL of Russian production with a new-generation safe relay controller was installed at the station.