solutions
/ BAM: + 5 STATIONS TO THE DIGITS

BAM: + 5 STATIONS TO THE DIGITS

BAM: + 5 STATIONS TO THE DIGITS

The development of the Eastern Polygon is one of the priorities for the Signaling Division of 1520 Group of Companies. Works on modernization of the facilities and re-equipment of the railway signaling equipment are well underway on the Baikal-Amur Mainline.

 In October, the next 5 objects of the BAM of the Far Eastern Railway were put into operation: crossing loop 3412 km (8 points) of the railway line Suluk - Mogdy, crossing loop 2769 km (8 points) of the railway line Ulyanovsky Stroitel - Ogoron, crossing loop 3605 km (8 points) of the railway line Ebgun - Posteshevo, crossing loop 3605 km (8 points) and track post 3609 km (2 points). 

Traffic control at all facilities will be provided by the modern Russian signaling equipment - the CBI-EL system developed and produced by the Signaling Division with its own built-in integrated system for increasing cybersecurity, which excludes unauthorized access to the digital equipment. 

The systems that the Signaling Division implements at the BAM are adapted to the harsh climate. All automation is equipped with the surge overvoltage protection systems.

Digitalization of the BAM facilities ensures traffic safety, increases line efficiency and reduces operating costs.