solutions
/ 1520 GROUP OF COMPANIES MODERNIZED THE FIRST DEPOT OF THE BIG CIRCLE METRO LINE WITH THE CBI SYSTEM

1520 GROUP OF COMPANIES MODERNIZED THE FIRST DEPOT OF THE BIG CIRCLE METRO LINE WITH THE CBI SYSTEM

1520 GROUP OF COMPANIES MODERNIZED THE FIRST DEPOT OF THE BIG CIRCLE METRO LINE WITH THE CBI SYSTEM

The 1520 Group of Companies reconstructed the Zamoskvoretskoye depot to integrate it with the Big Circle Line of the Moscow Metro. The CBI system was installed here and from December 7, 2021 it started control of the rolling stock that arrives to the depot for service.

The first Big Circle Line depot will serve 40 of the most modern trains «Moscow-2020». Automation and telemechanics devices will switch points and traffic lights, diagnose the system.

The reconstruction of the Zamoskvoretskoye depot was carried out as part of the Moscow Metro development program. Later, two more depots will be opened — Nizhegorodskoye and Aminevskoye, where computer-based train control systems will also be installed.

Also on December 7, a halt platform of the Aminevskiy suburban railway station was opened on the Kiev direction of Moscow Railways, which was built by the 1520 United Construction Company. Passengers arriving from the region will be able to go from here via an underground walking tunnel to the station of the same name on the Big Circle Metro Line.