Introduction of the EBILock 950 CBI system at the Riga-Passenger station
The Riga-Passenger station (145 points) was equipped with the EBILock 950 CBI system. The project became one of the first realized in the Baltic States. It was started in 2000 and successfully finished in 2001 forming a good basis for our further cooperation with Latvian railways.