Introduction of the EBILock 950 CBI system at the Riga-Passenger station

The Riga-Passenger station (145 points) was equipped with the EBILock 950 CBI system. The project became one of the first realized in the Baltic States. It was started in 2000 and successfully finished in 2001 forming a good basis for our further cooperation with Latvian railways.

Modernization of the East — West railway corridor, Stage 2

22 stations (215 points) and about 200 km of automatic line block were equipped with the EBILock 950 system, the integrated automatic level crossing system EBIGate 2000.

The project implementation period — 2010- 2011.

In addition to the EBILock 950 system and automatic line blocks, we equipped two large traffic control centres at Yelgava and Daugavpils transport junctions. During this project we gained experience implementing the new generation of the EBILock 950 CBI R4 system. This new Central processor unit is capable of supervising the largest stations and whole sections of the railways.

Construction of the second track in the Skriveri — Kruspils section

9 stations (158 points) were equipped with the EBILock 950 CBI system and 50 km of automatic line block. Project implementation period — 2014.

Introduction of the EBILock 950 CBI R4 system at the Shkirotava station

Project implementation: 2015. 

211 points.

Introduction of the EBILock 950 CBI R4 system at the Krievusala station

Project implementation: 2015.

22 points.

Introduction of the EBILock 950 CBI R4 system at The Zasulauks — Bolderaya section

Project implementation: 2015.