A pilot project in Kazakhstan — The Eginsu station (Almaty railway division)
The Eginsu station (6 points) is the first pilot project launched in Kazakhstan. It was to repair the damage done as a result of disastrous floods which had closed whole sections of Kazakhstan railways, including the Eginsu station. It was imperative that we restore the train traffic as soon as possible.
Using our experience in the 1520 gauge territory, we managed to successfully complete and re-commission this vital line in only three months, all whilst maintaining the highest safety levels. The station was re-commissioned in 2010.
Using our experience in the 1520 gauge territory, we managed to successfully complete and re-commission this vital line in only three months, all whilst maintaining the highest safety levels. The station was re-commissioned in 2010.